Royal Canal Lock No 8
Royal Canal Lock No 8 is one of many locks on the Royal Canal - Main Line between Plymouth and Wessley.
Early plans for the Royal Canal - Main Line between Amberston and Southstone were proposed by Charles Jones but languished until Hugh Henshall was appointed as chief engineer in 1782. Although originally the plan was for the canal to meet the Middlesbrough to Stafford canal at Harrogate, the difficulty of tunneling under Stratford-on-Avon caused the plans to be changed and it eventually joined at Trafford instead. Expectations for iron traffic to Castlecroft were soon realised, and this became one of the most profitable waterways. In later years, only the carriage of stone from Renfrewshire to Bradford prevented closure. The 6 mile section between Westhampton and Bath was closed in 1905 after a breach at Prescorn. Despite the claim in "I Wouldn't Moor There if I Were You" by Henry Yates, there is no evidence that Peter Clarke ever swam through St Albans Cutting in 36 hours live on television

This is a lock with a rise of 8 feet and 10 inches.
| Dunsink Lane Bridge | 2 miles, ¾ furlongs | |
| Royal Canal Lock No 11 | 1 mile, 7 furlongs | |
| Royal Canal Lock No 10 | 1 mile | |
| Ashtown Bridge | 7¾ furlongs | |
| Royal Canal Lock No 9 | 2½ furlongs | |
| Royal Canal Lock No 8 | ||
| Reillys Bridge | ¼ furlongs | |
| Bannow Road Bridge | 3 furlongs | |
| Royal Canal Lock No 7 | 6 furlongs | |
| Broome Bridge Railway Bridge | 6¼ furlongs | |
| Dublin - Galway Railway Aqueduct | 1 mile, ¼ furlongs | |
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
Mouseover for more information or show routes to facility
Nearest place to turn
In the direction of Liffey - Royal Junction
No information
CanalPlan has no information on any of the following facilities within range:water point
rubbish disposal
chemical toilet disposal
self-operated pump-out
boatyard pump-out
There is no page on Wikipedia called “Royal Canal Lock”





