CanalPlanAC

Genesee Expressway (southbound) Bridge E-144B

 
Genesee Expressway, Brighton, NY 14692, United States of America (I 390)
 
Information about the place
Genesee Expressway (southbound) Bridge E-144B is a minor waterways place on the New York State Canal System (Erie Canal) between Erie - Cayuga-Seneca East Junction (Junction of the Erie and Cayuga-Seneca Canals) (56.41 miles and 9 locks to the east) and South Grand Island Bridge (83.62 miles and 2 locks to the west).
 
 
The nearest place in the direction of Erie - Cayuga-Seneca East Junction is Genesee Expressway (northbound) Bridge E-144A; 0.05 miles away.
 
The nearest place in the direction of South Grand Island Bridge is I-390/590 (eastbound) Bridge E-144C; 0.52 miles away.

Mooring here is unrated.

There is a bridge here which takes a motorway over the canal.

 
 
Amenities
 
Maps
If you are a user and are logged on, or if you are actively planning a route, a map will be displayed here.
Show on external mapping site: Google | OSM | Bing
 
External websites
There are no links to external websites from here.
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
 
Nearest facilities

Mouseover for more information or show routes to facility

No information

CanalPlan has no information on any of the following facilities within range:
water point
rubbish disposal
chemical toilet disposal
place to turn
self-operated pump-out
boatyard pump-out
 
 
Geograph
 
Wikipedia

There is no page on Wikipedia called “Genesee Expressway (southbound) Bridge E-144B”

Wikipedia pages that might relate to Genesee Expressway (southbound) Bridge E-144B
[New York State Thruway] opened on August 25, 2017. Southbound/eastbound traffic remained on the old bridge until October 6, 2017. At that point, southbound/eastbound traffic shifted [Interstate 5 in California] Freeway, and West Side Freeway. I-5 is part of the California Freeway and Expressway System, and is part of the National Highway System, a network of highways [Interstate 75 in Michigan] $289 million in 2019) when the southbound span finally opened on September 19, 1988. The structure is the largest concrete segmental bridge in the United States [U.S. Route 23 in Michigan] $250 million in 2019) when the southbound span finally opened on September 19, 1988. The structure is the largest segmental concrete bridge in the country. While [New York State Route 12] New Hartford, the route intersects Genesee Street (unsigned NY 921E), then NY 5 a short distance east of where NY 12B terminates at NY 5. NY 12 turns east [Interstate 69 in Michigan] Lennon. The interchange with M-13 south of Lennon marks the Shiawassee–Genesee county line. Continuing eastward, I-69 parallels Miller Road to the north [List of reference routes in New York] primarily covers the western Finger Lakes and Genesee Valley areas. The counties comprising this region are Genesee, Livingston, Monroe, Ontario, Orleans, Wayne
 
Google