CanalPlanAC

Barrow Tidal Junction

 
The Barrow Way, St. Mullin's, County Carlow, Ireland
 
Information about the place
Barrow Tidal Junction is a minor waterways place at the junction of the Barrow Navigation (Non - Tidal Section) with the Barrow Navigation (Tidal Section).
 
Grand - Barrow Junction (Junction of the Grand Canal (Barrow Line) with the River Barrow ) is on the Barrow Navigation (Non - Tidal Section), 42 miles and 1¼ furlongs and 24 locks to the north. Barrow - Suir Junction (Junction of the Barrow Navigation with the River Suir) is on the River Suir, 22 miles and ¾ furlongs to the south.
 
 
The nearest place in the direction of Grand - Barrow Junction is St. Mullins Lock; ½ furlongs away.
 
The nearest place in the direction of Barrow - Suir Junction is Ferrymountgarrett Lift Bridge; 7 miles and 7 furlongs away.

Mooring here is unrated.

 
 
Amenities
 
Maps
If you are a user and are logged on, or if you are actively planning a route, a map will be displayed here.
Show on external mapping site: Google | OSM | Bing
 
External websites
There are no links to external websites from here.
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
 
Nearest facilities

Mouseover for more information or show routes to facility

Nearest place to turn

In the direction of Stanhope Street Slipway

St. Mullins Lock Winding Hole1 furlong and 1 lock away
On the Barrow Navigation (Non - Tidal Section) in the direction of Stanhope Street Slipway

No information

CanalPlan has no information on any of the following facilities within range:
water point
rubbish disposal
chemical toilet disposal
self-operated pump-out
boatyard pump-out
 
 
Geograph
 
Wikipedia

There is no page on Wikipedia called “Barrow Tidal Junction”

Wikipedia pages that might relate to Barrow Tidal Junction
[New Holland, Lincolnshire] (NEW), a sea port village in Barrow-upon-Humber parish, Lincoln; on the river Humber, and on the Grimsby and Sheffield Junction railway, opposite Hull, 4 [London water supply infrastructure] Act 1852 allowed all water extractors three years to find wells or non-tidal sources. London's water businesses (known also as undertakings) nationalised [West Middlesex Waterworks Company] Central London. Soon after, in 1825 the company built a new reservoir at Barrow Hill next to Primrose Hill just north of Central London. In the 1850s the [Bristol Harbour] Beyond the lock is a junction: on one arm the navigable River Avon continues upstream to Bath, and on the other arm is the tidal River Avon. The first [River Tyburn] two streams in the hills of South Hampstead, as the broad ravine between Barrow and Primrose Hills. Its main source was the Shepherd's Well near Fitzjohn's [Flimby railway station] railway station on the Cumbrian Coast Line, which runs between Carlisle and Barrow-in-Furness. The station, situated 29 miles (47 km) south-west of Carlisle [River Mersey] formed the Woolston Eyes nature reserve, and on to Warrington. The river is tidal from Howley Weir in Warrington, although high spring tides often top the [Ipswich Waterfront] the waterfront. The area around the quays was flooded in 2013 during a tidal surge. In February 2019 a flood gate, which protects the 'New Cut' were [Alaska] and the Prudhoe Bay Oil Field. The city of Utqiaġvik, formerly known as Barrow, is the northernmost city in the United States and is located here. The [River Tamar] length of the tidal river (which, like other tidal waters in England, has public right of navigation) is 19.2 miles (30.9 km). The normal tidal limit (noted
 
Google