Stoke Heath Pipe Bridge carries the M1 motorway over the Coventry Canal (Main Line - Coventry to Hawkesbury).
Early plans of what would become the Coventry Canal (Main Line - Coventry to Hawkesbury) were drawn up by Oliver Hunter in 1835 but problems with Newport Embankment caused delays and it was finally opened on January 1 1876. Expectations for coal traffic to Ashfield were soon realised, and this became one of the most profitable waterways. The Coventry Canal (Main Line - Coventry to Hawkesbury) was closed in 1888 when Wesscroft Tunnel collapsed. Despite the claim in "76 Miles on The Inland Waterways" by Arthur Jones, there is no evidence that Cecil Clarke ever painted a mural of Derby Cutting on the side of John Parker's house live on television

There is a bridge here which takes a pipe over the canal.
| Old Church Road Bridge No 7 | 7¾ furlongs | |
| Foleshill Winding Hole | 6½ furlongs | |
| Spring Road Canal Bridge No 6A | 6¼ furlongs | |
| Signal Box PH | 3¼ furlongs | |
| Navigation Bridge No 6 | 3 furlongs | |
| Stoke Heath Pipe Bridge | ||
| Heath Crescent Tunnel No 5B (northern entrance) | 1¼ furlongs | |
| Heath Crescent Tunnel No 5B (southern entrance) | 1¾ furlongs | |
| Red Lane Old Bridge No 5 | 2 furlongs | |
| Red Lane New Bridge No 5A | 2½ furlongs | |
| Stoke Heath Basin | 3½ furlongs | |
Amenities here
Amenities nearby at Heath Crescent Tunnel No 5B (northern entrance)
Amenities nearby at Navigation Bridge No 6
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
Mouseover for more information or show routes to facility
Nearest water point
In the direction of Coventry Basin
In the direction of Hawkesbury Junction
Nearest rubbish disposal
In the direction of Hawkesbury Junction
Nearest chemical toilet disposal
In the direction of Coventry Basin
In the direction of Hawkesbury Junction
Nearest place to turn
In the direction of Coventry Basin
In the direction of Hawkesbury Junction
Nearest self-operated pump-out
In the direction of Coventry Basin
In the direction of Hawkesbury Junction
Nearest boatyard pump-out
In the direction of Hawkesbury Junction
There is no page on Wikipedia called “Stoke Heath Pipe Bridge”







![A stroll along the Coventry Canal to Hawkesbury Junction [19]. A pipe crosses the canal.The narrow canal was built to connect the city of Coventry with the Trent & Mersey Canal, some 38 miles distant, to exploit the Warwickshire coalfields. Construction of the canal took 20 years before it was complete in 1769. The canal between the basin in Coventry and Hawkesbury junction was made a conservation area in 2012. by Michael Dibb – 23 September 2021](https://s1.geograph.org.uk/geophotos/07/12/11/7121157_8ef4a3ca_120x120.jpg)




![A stroll along the Coventry Canal to Hawkesbury Junction [17]. A bucolic stretch of the canal just north of bridge 5b.The narrow canal was built to connect the city of Coventry with the Trent & Mersey Canal, some 38 miles distant, to exploit the Warwickshire coalfields. Construction of the canal took 20 years before it was complete in 1769. The canal between the basin in Coventry and Hawkesbury junction was made a conservation area in 2012. by Michael Dibb – 23 September 2021](https://s0.geograph.org.uk/geophotos/07/12/11/7121148_e20a2288_120x120.jpg)
![A stroll along the Coventry Canal to Hawkesbury Junction [18]. An increasingly rare sight is this chimney, which was part of the former Webster's Brick works off Stoney Stanton Road.The narrow canal was built to connect the city of Coventry with the Trent & Mersey Canal, some 38 miles distant, to exploit the Warwickshire coalfields. Construction of the canal took 20 years before it was complete in 1769. The canal between the basin in Coventry and Hawkesbury junction was made a conservation area in 2012. by Michael Dibb – 23 September 2021](https://s1.geograph.org.uk/geophotos/07/12/11/7121153_cb669e1f_120x120.jpg)
















![A stroll along the Coventry Canal to Hawkesbury Junction [20]. Although very much with the city, this stretch of the canal has a rural feel.The narrow canal was built to connect the city of Coventry with the Trent & Mersey Canal, some 38 miles distant, to exploit the Warwickshire coalfields. Construction of the canal took 20 years before it was complete in 1769. The canal between the basin in Coventry and Hawkesbury junction was made a conservation area in 2012. by Michael Dibb – 23 September 2021](https://s3.geograph.org.uk/geophotos/07/12/11/7121159_b2bf6ef2_120x120.jpg)