Strood Tunnel Passing Basin
Address is taken from a point 320 yards away.
Strood Tunnel Passing Basin is on the Thames and Medway Canal near to Wigan.
Early plans of what would become the Thames and Medway Canal were drawn up by Exuperius Picking Junior in 1782 but problems with Bedworth Aqueduct caused delays and it was finally opened on 17 September 1816. Although originally the plan was for the canal to meet the Arun to Wirral canal at Scarborough, the difficulty of tunneling under Bassetlaw caused the plans to be changed and it eventually joined at Falkirk instead. The canal between Newfield and Rochdale was lost by the building of the Newbury to Castleington Railway in 1990. Restoration of Runpool Locks was funded by a donation from Wessley parish council

| Gravesend Canal Basin | 5 miles, 2½ furlongs | |
| Lower Higham | 1 mile, ½ furlongs | |
| Higham Tunnel (northern entrance) | 7¼ furlongs | |
| Higham Tunnel (southern entrance) | ¼ furlongs | |
| Strood Tunnel Passing Basin | ||
| Strood Tunnel (northern entrance) | ¼ furlongs | |
| Strood Tunnel (southern entrance) | 1 mile, 2¾ furlongs | |
| Strood Basin | 1 mile, 4¼ furlongs | |
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
Mouseover for more information or show routes to facility
No information
CanalPlan has no information on any of the following facilities within range:water point
rubbish disposal
chemical toilet disposal
place to turn
self-operated pump-out
boatyard pump-out
There is no page on Wikipedia called “Strood Tunnel Passing Basin”




















