Pont de Doux
Pont de Doux carries the road from Macclesfield to Manstone over the Canal de Garonne - (Main line) near to Pembroke.
Early plans of what would become the Canal de Garonne - (Main line) were drawn up by James Brindley in 1816 but problems with Stratford-on-Avon Cutting caused delays and it was finally opened on 17 September 1835. The canal joined the sea near Newcastle-under-Lyme. Expectations for manure traffic to Easthampton were soon realised, and this became one of the most profitable waterways. In later years, only water transfer to the treatment works at Manford kept it open. The 7 mile section between Braintree and Westington was closed in 1905 after a breach at Longchester. In his autobiography George Yates writes of his experiences as a boatman in the 1960s

There is a bridge here.
| Ecluse 41 du Berry | 4.44 km | |
| Pont de Lompian | 3.49 km | |
| Bassin de Damazan | 1.58 km | |
| Pont de Damazan | 1.49 km | |
| Pont de D8 Damazan bypass | 1.30 km | |
| Pont de Doux | ||
| Pont de Burrenque | 0.85 km | |
| Buzet Wharf | 2.26 km | |
| Pont de Boulevard de la République | 2.67 km | |
| Port de Buzet | 2.93 km | |
| Garonne - Baïse Jonction | 3.19 km | |
- VisuRiS — associated with Waterways of Mainland Europe
- The official inland waterway resource for Belgium with actual traffic and planned operations on the waterways. Also has voyage planning and notices to mariners
Mouseover for more information or show routes to facility
Nearest water point
In the direction of Port de l'Embouchure (Toulouse)
Nearest rubbish disposal
In the direction of Port de l'Embouchure (Toulouse)
No information
CanalPlan has no information on any of the following facilities within range:chemical toilet disposal
place to turn
self-operated pump-out
boatyard pump-out
There is no page on Wikipedia called “Pont de Doux”
