CanalPlanAC

Gravel Works Conveyor Bridge No 20 (demolished)

 
3 New Mill, Theale RG7 4AJ, United Kingdom
Address is taken from a point 292 yards away.
 
Information about the place
Gravel Works Conveyor Bridge No 20 (demolished) is a minor waterways place on the River Kennet between Burghfield Bridge No 14 (Burghfield) (2 miles and 4¾ furlongs and 3 locks to the east) and Newbury Lock No 85 (12 miles and 3½ furlongs and 14 locks to the west).
 
 
The nearest place in the direction of Burghfield Bridge No 14 is Sheffield Lock Weir Entrance; a few yards away.
 
The nearest place in the direction of Newbury Lock No 85 is Winding Hole below Sulhampstead Lock (Sulhampstead Lock Weir Exit); 4¼ furlongs away.

Mooring here is unrated.

This is the site of a bridge, the canal may be narrow as a consequence.

 
 
Amenities

Amenities nearby at Sheffield Lock Weir Entrance

 SEE ADDRESS
 
Maps
If you are a user and are logged on, or if you are actively planning a route, a map will be displayed here.
Show on external mapping site: Google | OSM | Bing
 
Additional information

There is no other information about Gravel Works Conveyor Bridge No 20 (demolished). Why not add some

 
External websites
There are no links to external websites from here.
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
 
Nearest facilities

Mouseover for more information or show routes to facility

Nearest water point

In the direction of Northcroft Lane Arm

Tyle Mill Lock C&RT Services1 mile, 2¾ furlongs and 1 lock away
On this waterway in the direction of Northcroft Lane Arm
Aldermaston Lock No 953 miles, 5¼ furlongs and 4 locks away
On this waterway in the direction of Northcroft Lane Arm
Ham Manor Marina11 miles, 3¼ furlongs and 13 locks away
On this waterway in the direction of Northcroft Lane Arm
Kintbury Services18 miles, 3¾ furlongs and 22 locks away
Travel to Northcroft Lane Arm, then on the Kennet and Avon Canal (Main Line) to Kintbury Services

In the direction of High Bridge Reading

Thames & Kennet Marina7 miles, ¾ furlongs and 7 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Thames & Kennet Marina
Shiplake Lock11 miles, 5¾ furlongs and 8 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Shiplake Lock
Cleeve Lock19 miles, ¾ furlongs and 11 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Cleeve Lock

Nearest rubbish disposal

In the direction of Northcroft Lane Arm

Tyle Mill Lock C&RT Services1 mile, 2¾ furlongs and 1 lock away
On this waterway in the direction of Northcroft Lane Arm
Aldermaston Lock No 953 miles, 5¼ furlongs and 4 locks away
On this waterway in the direction of Northcroft Lane Arm
Ham Manor Marina11 miles, 3¼ furlongs and 13 locks away
On this waterway in the direction of Northcroft Lane Arm
Kintbury Services18 miles, 3¾ furlongs and 22 locks away
Travel to Northcroft Lane Arm, then on the Kennet and Avon Canal (Main Line) to Kintbury Services

In the direction of High Bridge Reading

Shiplake Lock11 miles, 5¾ furlongs and 8 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Shiplake Lock
Mapledurham Lock12 miles, ¾ furlongs and 8 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Mapledurham Lock
Marsh Lock14 miles, 3½ furlongs and 9 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Marsh Lock
Hambleden Lock17 miles, 6¼ furlongs and 10 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Hambleden Lock
Goring Lock18 miles, 3¾ furlongs and 10 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Goring Lock

Nearest chemical toilet disposal

In the direction of Northcroft Lane Arm

Tyle Mill Lock C&RT Services1 mile, 2¾ furlongs and 1 lock away
On this waterway in the direction of Northcroft Lane Arm
Aldermaston Lock No 953 miles, 5¼ furlongs and 4 locks away
On this waterway in the direction of Northcroft Lane Arm
Ham Manor Marina11 miles, 3¼ furlongs and 13 locks away
On this waterway in the direction of Northcroft Lane Arm
Kintbury Services18 miles, 3¾ furlongs and 22 locks away
Travel to Northcroft Lane Arm, then on the Kennet and Avon Canal (Main Line) to Kintbury Services

In the direction of High Bridge Reading

Thames & Kennet Marina7 miles, ¾ furlongs and 7 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Thames & Kennet Marina
Shiplake Lock11 miles, 5¾ furlongs and 8 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Shiplake Lock
Mapledurham Lock12 miles, ¾ furlongs and 8 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Mapledurham Lock

Nearest place to turn

In the direction of Northcroft Lane Arm

On this waterway in the direction of Northcroft Lane Arm
Draper's Osier Bed Stream Leaves7½ furlongs and 1 lock away
On this waterway in the direction of Northcroft Lane Arm
Winding Hole below Tyle Mill Lock1 mile, 2¼ furlongs and 1 lock away
On this waterway in the direction of Northcroft Lane Arm
Tyle Mill Winding Hole1 mile, 5 furlongs and 2 locks away
On this waterway in the direction of Northcroft Lane Arm
Winding Hole by Ufton Swing Bridge1 mile, 7¾ furlongs and 2 locks away
On this waterway in the direction of Northcroft Lane Arm
Winding Hole below Padworth Lock3 miles, 2½ furlongs and 3 locks away
On this waterway in the direction of Northcroft Lane Arm
Aldermaston Arm3 miles, 5 furlongs and 4 locks away
On this waterway in the direction of Northcroft Lane Arm
Frouds Bridge Marina (entrance)4 miles, 5¾ furlongs and 5 locks away
On this waterway in the direction of Northcroft Lane Arm

In the direction of High Bridge Reading

Sheffield Lock Weir Entrancea few yards away
On this waterway in the direction of High Bridge Reading
Winding Hole below Garston Lock7 furlongs and 2 locks away
On this waterway in the direction of High Bridge Reading
Burghfield Mill Winding Hole1 mile, 6 furlongs and 2 locks away
On this waterway in the direction of High Bridge Reading
Burghfield Lock Weir Exit2 miles, 1½ furlongs and 3 locks away
On this waterway in the direction of High Bridge Reading
Burghfield Island Entrance No 22 miles, 4½ furlongs and 3 locks away
On this waterway in the direction of High Bridge Reading
Burghfield Island Entrance No 12 miles, 6¼ furlongs and 3 locks away
On this waterway in the direction of High Bridge Reading
Southcote Lock Weir Exit3 miles, 3¼ furlongs and 4 locks away
On this waterway in the direction of High Bridge Reading
Fobney Lock Weir Entrance3 miles, 5¼ furlongs and 4 locks away
On this waterway in the direction of High Bridge Reading
Winding Hole above Fobney Lock4 miles, 1 furlong and 4 locks away
On this waterway in the direction of High Bridge Reading
Fobney Lock Weir Exit4 miles, 1½ furlongs and 5 locks away
On this waterway in the direction of High Bridge Reading
Winding Hole above County Lock5 miles, 5¾ furlongs and 5 locks away
On this waterway in the direction of High Bridge Reading
Reading Jail Loop (western entrance)6 miles, 3 furlongs and 6 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Reading Jail Loop (western entrance)

Nearest self-operated pump-out

In the direction of Northcroft Lane Arm

Tyle Mill Lock C&RT Services1 mile, 2¾ furlongs and 1 lock away
On this waterway in the direction of Northcroft Lane Arm
Kintbury Services18 miles, 3¾ furlongs and 22 locks away
Travel to Northcroft Lane Arm, then on the Kennet and Avon Canal (Main Line) to Kintbury Services

In the direction of High Bridge Reading

Mapledurham Lock12 miles, ¾ furlongs and 8 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Mapledurham Lock

Nearest boatyard pump-out

In the direction of Northcroft Lane Arm

Newbury Marina12 miles and 14 locks away
On this waterway in the direction of Northcroft Lane Arm

In the direction of High Bridge Reading

Thames & Kennet Marina7 miles, ¾ furlongs and 7 locks away
Travel to High Bridge Reading, then on the River Thames (River Kennet) to Thames - Kennet Junction (Kennet Mouth), then on the River Thames (below Oxford) to Thames & Kennet Marina
Direction of TV transmitter (From Wolfbane Cybernetic)
 
 
Geograph
 
Wikipedia

There is no page on Wikipedia called “Gravel Works Conveyor Bridge No 20”

Wikipedia pages that might relate to Gravel Works Conveyor Bridge No 20
[Construction aggregate] medium-grained particulate material used in construction, including sand, gravel, crushed stone, slag, recycled concrete and geosynthetic aggregates. Aggregates [Concrete mixer] as sand or gravel, and water to form concrete. A typical concrete mixer uses a revolving drum to mix the components. For smaller volume works, portable [Interstate 8] and rocks were transported on a conveyor belt across US 80 to become part of an embankment for the Sweetwater River Bridge, the grading of the mountain near [Sandbag] (PDF). War Office. Military Training Pamphlet No 30, Part V: Protective Works. 1941. p. 39 specifies 20 inches (510 mm) of sand in bags as proof against [Education] 2009.01038.x. PMID 26162104. S2CID 2112166. Ansari, D; Coch, D (2006). "Bridges over troubled waters: Education and cognitive neuroscience". Trends in [Leighton Buzzard Light Railway] lines within their quarries. These were eventually replaced by roads and conveyor belts and the last internal quarry line was abandoned in 1981. Today the [Crusher] crusher is a machine designed to reduce large rocks into smaller rocks, gravel, sand or rock dust. Crushers may be used to reduce the size, or change the [Industrial Revolution] automated flour mill in the mid-1780s that used control mechanisms and conveyors so that no labour was needed from the time grain was loaded into the elevator [Tertiary sector of the economy] Kenichi Ohmae noted that: In the United States 70 percent of the workforce works in the service sector; in Japan, 60 percent, and in Taiwan, 50 percent. [Chicago Tunnel Company] Municipal Engineering, Volume XXXV, No. 1 (July 1908); page 21. George W. Jackson, Scow for Transporting Gravel, U.S. Patent 1,047,233, Dec. 17, 1912
 
Google

Results of Google Search

Construction aggregate - Wikipedia
Construction aggregate, or simply "aggregate", is a broad category of coarse to medium ... Where there is no pit sand, we must use the kinds washed up by rivers or by the ... In these areas, natural sand and gravel are mined for use as aggregate. .... more of both materials are recycled by construction and demolition firms not ...
Chapter 33 - Safeguards During Construction or Demolition
or demolition practices, including but not limited to debris removal, and to act in ... subcontractors engaged in building work shall institute and maintain safety ..... trian bridge shall be provided. 3303.1.3 ..... earth, sand, gravel, or other material, as well as for purposes of ..... within 20 feet (6096 mm) of a floor opening used for .
SR 520 floating bridge Construction Water Quality Monitoring and ...
Dec 9, 2014 ... SR 520 Evergreen Point. Floating Bridge and Landings Project. 07/20/2016 REVISION 6. Page i. Environmental Compliance Plan. Appendix I: ...
DEMOLITION SPECIFICATIONS
Jan 31, 2005 ... This Demolition Plan sets forth the general specifications for the ... equipment, shall be filled and contoured with clean imported gravel or ... Examples include, but are not limited to, the following: ... Boiler ash pits under the hog boilers; and, ... chip conveyors to the digester building and the sky bridge to the ...
FY15 Fatalities and Catastrophes To Date
Nov 20, 2014 ... Saul (no last name provided) .... Worker performing highway work struck and killed .... Fatality. 9/4/2015 MAS Building & Bridge Inc., Taunton, .... Worker killed after falling into gravel ... wall during demolition. Fatality. 1090980. 8/20/2015 AWI Transport LLC, Killdeer, ND 58640 ... conveyors on elevator motor.
CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION OR ...
Implements used to facilitate construction or demolition work. ...... sand, gravel, or other material, as well as to soil and foundation work related to accessory ..... but in no case shall be less than 20 pounds per square foot (98 kg/m2). ...... 3307.2.6 Requirements for sidewalks, temporary walkways, foot bridges, and pathways.
Gravel Roads Construction and Maintenance Guide
With this type of work, additional equipment may be used ... The original “Gravel Roads Maintenance and Design Manual” was .... 1.14 Breaking up Sod and Vegetation in Recovered Material ..........20 ...... has destroyed the ..... the bridge approach. ..... from the discharge conveyor belt that is not representative of the entire ...
Cost Estimating Guide for Road Construction, March 2017
13. Table 1. Adjustment Factor for Public Works Davis-Bacon Zones . ...... Cost Estimating Bridge Construction for Programming . ..... Do not have a separate pay item for ..... Asphalt. 20-40. Large project, road mix, wide tolerance, surface treatments ...... for loose pit-run gravel and less for unsurfaced roads in clay material.
ENGINEERING GROUP MATERIALS & WORKMANSHIP ...
Jun 1, 2010 ... Chapter 16 BORED TUNNELS AND RELATED WORKS. Chapter 17 SPRAYED ... Chapter 20 SEWERAGE AND SANITARY PLUMBING. Chapter 21 WATER SERVICES. Chapter 22 (Not Used). Chapter 23 ... Method of Demolition. 2.3.3 ..... Flower Troughs and Planting/Turfing Areas on Bridge Decks. 13.4.
Publication 207
Jan 1, 2014 ... E. Quarries/Gravel, Etc. . .... which a Wisconsin sales or use tax has not previous- ly been paid. Example 1: .... The $20. BTR fee is not required for a consumer's use tax certificate. ..... walls, roads, walks, bridges, fences, retain- ... building demolition work ... contractor's charge for installing the conveyor is.