Site of Flat Bridge
Deck removed 2018
Also known as: Flat Bridge, Willingham
Flat Bridge, South Cambridgeshire CB24 5JW, United Kingdom

Site of Flat Bridge
is a minor waterways place
on the River Great Ouse (Old West River - Small River) between
Earith Junction (Junction with Old West River, New Bedford River and the River Great Ouse (Tidal Section)) (1 mile and 7¾ furlongs
and 1 lock
to the northwest) and
Pope's Corner (Junction of River Cam with Old West River) (9 miles and 5 furlongs
to the east).
The nearest place in the direction of Earith Junction is Hermitage Marina;
1 mile and 7 furlongs
away.
The nearest place in the direction of Pope's Corner is GOBA Moorings Aldreth;
1 mile and 1½ furlongs
away.
There may be access to the towpath here.
Mooring here is impossible (it may be physically impossible, forbidden, or allowed only for specific short-term purposes).
This is the site of a bridge, the canal may be narrow as a consequence.
Earith Junction | 1 mile, 7¾ furlongs | |
Hermitage Lock | 1 mile, 7¼ furlongs | |
Hermitage Marina | 1 mile, 7 furlongs | |
Site of Flat Bridge | ||
GOBA Moorings Aldreth | 1 mile, 1½ furlongs | |
Aldreth Bridge | 1 mile, 4¼ furlongs | |
Great Ouse - Cottenham Lode Junction | 4 miles, 7¼ furlongs | |
Twenty Pence Bridge | 5 miles, ¼ furlongs | |
Twenty Pence Marina | 5 miles, 1¾ furlongs |
- Great Ouse Navigation | boating, moorings, navigation notices — associated with River Great Ouse
- Information regarding the Great Ouse navigation and tributaries.
- Information for boaters on the River Great Ouse - GOV.UK — associated with River Great Ouse
- River Great Ouse: bridge heights, locks, overhead power lines and facilities.
- Facebook Account — associated with River Great Ouse
- Anglian Waterways Manager Facebook Account
- Facebook Anglian Waterways Page — associated with River Great Ouse
- Facebook Page for Environment Agency Anglian Waterways
Mouseover for more information or show routes to facility
Nearest water point
In the direction of Pope's Corner
Fish and Duck Marina Fuel Dock — 9 miles, 4½ furlongs away
On this waterway in the direction of Pope's Corner
Fish and Duck Marina — 9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina
Reach Lode Sluice — 12 miles, 6¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Cam - Reach Lode Junction, then on the River Cam (Burwell Lode) to Reach Lode Sluice
Willow Walk Visitor Moorings — 13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings
Prickwillow Visitor Moorings (EA) — 19 miles, ¾ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Old West River - River Lark Junction, then on the River Great Ouse (River Lark) to Prickwillow Visitor Moorings (EA)
In the direction of Earith Junction
Westview Marina & Leisure Park — 2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Pike and Eel Marina — 5 miles, 2¼ furlongs and 2 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Pike and Eel Marina
Jones Boatyard — 9 miles, 2¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Jones Boatyard
The Waits Moorings — 9 miles, 7½ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to The Waits Moorings Junction, then on the River Great Ouse (Waits Mooring Arm) to The Waits Moorings
Hartford Marina — 13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford Marina
Huntingdon Boathaven Marina — 15 miles, 4 furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Huntingdon Boathaven MarinaNearest rubbish disposal
In the direction of Pope's Corner
Willow Walk Visitor Moorings — 13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings
In the direction of Earith Junction
Hermitage Lock — 1 mile, 7¼ furlongs away
On this waterway in the direction of Earith Junction
Buckden Marina — 19 miles, 2¾ furlongs and 7 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Buckden MarinaNearest chemical toilet disposal
In the direction of Pope's Corner
Fish and Duck Marina — 9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina
Willow Walk Visitor Moorings — 13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings
In the direction of Earith Junction
Westview Marina & Leisure Park — 2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Jones Boatyard — 9 miles, 2¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Jones Boatyard
Hartford Marina — 13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford MarinaNearest place to turn
In the direction of Pope's Corner
Pope's Corner — 9 miles, 5 furlongs away
On this waterway in the direction of Pope's Corner
Fish and Duck Marina — 9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina
Great Ouse - Braham Dock Junction — 11 miles, 4½ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Great Ouse - Braham Dock Junction
Willow Walk Winding Hole — 13 miles, 3½ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Winding Hole
Wicken Lode Junction — 13 miles, 1 furlong and 1 lock away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Cam - Reach Lode Junction, then on the River Cam (Burwell Lode) to Wicken Lode Junction
Bottisham Lock Weir Exit — 16 miles, 3 furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Bottisham Lock Weir Exit
Old West River - River Lark Junction — 17 miles, ¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Old West River - River Lark Junction
Holmes River Junction — 18 miles, 7½ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Holmes River Junction
Prickwillow Winding Hole — 19 miles, 1 furlong away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Old West River - River Lark Junction, then on the River Great Ouse (River Lark) to Prickwillow Winding Hole
Baits Bite Lock Weir Exit — 19 miles, 2¾ furlongs and 1 lock away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Baits Bite Lock Weir Exit
In the direction of Earith Junction
Westview Marina & Leisure Park — 2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Pike and Eel Marina — 5 miles, 2¼ furlongs and 2 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Pike and Eel Marina
Jones Boatyard — 9 miles, 2¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Jones Boatyard
The Waits Moorings Junction — 9 miles, 6½ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to The Waits Moorings Junction
The Waits Moorings Winding Hole — 10 miles, ¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to The Waits Moorings Junction, then on the River Great Ouse (Waits Mooring Arm) to The Waits Moorings Winding Hole
Hemingford Lock Weir Exit No 1 — 10 miles, 7¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hemingford Lock Weir Exit No 1
Hemingford Lock Weir Exit No 2 — 11 miles and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hemingford Lock Weir Exit No 2
Houghton Lock Weir Exit No 1 — 11 miles, 6¼ furlongs and 4 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Houghton Lock Weir Exit No 1
Houghton Lock Weir Entrance No 2 — 12 miles, 4½ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Houghton Lock Weir Entrance No 2
Hartford Marina — 13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford MarinaNearest self-operated pump-out
In the direction of Pope's Corner
Willow Walk Visitor Moorings — 13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings
In the direction of Earith Junction
Westview Marina & Leisure Park — 2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Hartford Marina — 13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford MarinaNearest boatyard pump-out
In the direction of Pope's Corner
Fish and Duck Marina — 9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina
In the direction of Earith Junction
Buckden Marina Fuel & Pump Out — 19 miles, 4¾ furlongs and 7 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Buckden Marina Fuel & Pump OutDirection of TV transmitter (From Wolfbane Cybernetic)
There is no page on Wikipedia called “Site of Flat Bridge”
Wikipedia pages that might relate to Site of Flat Bridge
[Flat Bridge]
Flat Bridge The Flat Bridge is a beam bridge across the Rio Cobre on the A1 road connecting the Jamaican capital Kingston, with the north coast tourist
[Red Road Flats]
The Red Road Flats were a mid-twentieth-century high-rise housing complex located between the districts of Balornock and Barmulloch in the northeast of
[Tortilla Flat, Arizona]
whenever it came due. Historic Mormon Flat and Boulder Creek Bridges in Tortilla Flat, Arizona Historic Mormon Flat Bridge built in 1924 and located on Highway
[Bridge to Nowhere (San Gabriel Mountains)]
flood of March 1–2, 1938. The East Fork Road project was abandoned as a result of the floods, leaving the bridge forever stranded in the middle of what
[Gordon, Victoria]
listed sites, including: Gordon-Egerton Road, Gordon railway station Portland Flat Road, Portland Flat Road Bridge Gordon is situated on the undulating foothills
[Crimean Bridge]
for both road and rail traffic, and has a length of 19 km (11.8 mi), making it the longest bridge Russia has ever built, and the longest bridge in Europe
[Whites Bridge]
Flat River. Carrying Whites Bridge Road across the Flat River, it is located north of the Fallasburg Bridge and south of Smyrna. The original bridge was
[Dunedin-Waitati Highway]
summit of Mount Cargill), Leith Valley Road, Dryden Road, and Pigeon Flat Road; the last of these is the only bridge north of the saddle. Several parts of
[Martin Bridge]
The Martin Bridge is a road bridge that carries the Manning River Drive across the Manning River in Taree, in the Mid North Coast region of New South
[Flat Bush]
approved for Flat Bush infrastructure" (PDF). Land Transport News (17): 1–2. June 2006. ISSN 1176-841X. Retrieved 8 December 2009. Ormiston Road Bridge opening
Results of Google Search
Freestone Flat Road Bridge (Sonoma County, 1955) | StructuraeSep 13, 2007 ... Freestone Flat Road Bridge is a truss bridge that was completed in 1955. The project is located in Sonoma County, California, USA, North ...
Deck truss bridge over Salmon Creek on Freestone Flat Road in Occidental.
The Flat Bridge is a beam bridge across the Rio Cobre on the A1 road connecting the Jamaican capital Kingston, with the north coast tourist areas of Dunn's ...
Bailey pony truss bridge over Burney Creek on Jack Rabbit Flat Road in Burney.
Capital Improvement Projects bridges roads. ... Project · Guardrail Replacement Project · Hardin Flat Road crossing South Fork of Tuolumne River, Bridge No.
Apr 17, 2012 ... BIG OAK FLAT ROAD HAER NO. CA-147: Yosemite National Park Roads and Bridges: Between Big Oak Flat Entrance and Merced River ...
Title: Tamarack Creek Bridge, Spanning Tamarack Creek on New Big Oak Flat Road, Yosemite Village, Mariposa County, CA; Contributor Names: Historic ...
Alhambra Valley Road Washout Repair (winner of 2018 APWA Northern California Chapter Disaster or ... RAIL ROAD FLAT ROAD BRIDGE REPLACEMENT.
Jones Bros. will begin construction on the south end of Cotton Flat Rd and work ... and want to build a driveway, you need to come by the Road & Bridge office to  ...
The Connecticut Department of Transportation is announcing that a bridge rehabilitation project will begin February 1, 2013 on Flat Rock Hill Road in the town of ...