CanalPlanAC

Site of Flat Bridge

 
Deck removed 2018
Also known as: Flat Bridge, Willingham
Flat Bridge, South Cambridgeshire CB24 5JW, United Kingdom
 
Information about the place
Site of Flat Bridge is a minor waterways place on the River Great Ouse (Old West River - Small River) between Earith Junction (Junction with Old West River, New Bedford River and the River Great Ouse (Tidal Section)) (1 mile and 7¾ furlongs and 1 lock to the northwest) and Pope's Corner (Junction of River Cam with Old West River) (9 miles and 5 furlongs to the east).
 
 
The nearest place in the direction of Earith Junction is Hermitage Marina; 1 mile and 7 furlongs away.
 
The nearest place in the direction of Pope's Corner is GOBA Moorings Aldreth; 1 mile and 1½ furlongs away.

There may be access to the towpath here.

Mooring here is impossible (it may be physically impossible, forbidden, or allowed only for specific short-term purposes).

This is the site of a bridge, the canal may be narrow as a consequence.

Earith Junction1 mile, 7¾ furlongs
Hermitage Lock1 mile, 7¼ furlongs
Hermitage Marina1 mile, 7 furlongs
Site of Flat Bridge
GOBA Moorings Aldreth1 mile, 1½ furlongs
Aldreth Bridge1 mile, 4¼ furlongs
Great Ouse - Cottenham Lode Junction4 miles, 7¼ furlongs
Twenty Pence Bridge5 miles, ¼ furlongs
Twenty Pence Marina5 miles, 1¾ furlongs
 
 
Amenities

Amenities here

 Mr Mark Chivers

Amenities nearby at Hermitage Marina

 Hermitage Marina
 
Maps
If you are a user and are logged on, or if you are actively planning a route, a map will be displayed here.
Show on external mapping site: Google | OSM | Bing
 
External websites
 Great Ouse Navigation | boating, moorings, navigation notices — associated with River Great Ouse
Information regarding the Great Ouse navigation and tributaries.
  Information for boaters on the River Great Ouse - GOV.UK  — associated with River Great Ouse
River Great Ouse: bridge heights, locks, overhead power lines and facilities.
 Facebook Account — associated with River Great Ouse
Anglian Waterways Manager Facebook Account
 Facebook Anglian Waterways Page — associated with River Great Ouse
Facebook Page for Environment Agency Anglian Waterways
 
Nearest facilities

Mouseover for more information or show routes to facility

Nearest water point

In the direction of Pope's Corner

Fish and Duck Marina Fuel Dock9 miles, 4½ furlongs away
On this waterway in the direction of Pope's Corner
Fish and Duck Marina9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina
Reach Lode Sluice12 miles, 6¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Cam - Reach Lode Junction, then on the River Cam (Burwell Lode) to Reach Lode Sluice
Willow Walk Visitor Moorings13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings
Prickwillow Visitor Moorings (EA)19 miles, ¾ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Old West River - River Lark Junction, then on the River Great Ouse (River Lark) to Prickwillow Visitor Moorings (EA)

In the direction of Earith Junction

Westview Marina & Leisure Park2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Pike and Eel Marina5 miles, 2¼ furlongs and 2 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Pike and Eel Marina
Jones Boatyard9 miles, 2¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Jones Boatyard
The Waits Moorings9 miles, 7½ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to The Waits Moorings Junction, then on the River Great Ouse (Waits Mooring Arm) to The Waits Moorings
Hartford Marina13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford Marina
Huntingdon Boathaven Marina15 miles, 4 furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Huntingdon Boathaven Marina

Nearest rubbish disposal

In the direction of Pope's Corner

Willow Walk Visitor Moorings13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings

In the direction of Earith Junction

Hermitage Lock1 mile, 7¼ furlongs away
On this waterway in the direction of Earith Junction
Buckden Marina19 miles, 2¾ furlongs and 7 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Buckden Marina

Nearest chemical toilet disposal

In the direction of Pope's Corner

Fish and Duck Marina9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina
Willow Walk Visitor Moorings13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings

In the direction of Earith Junction

Westview Marina & Leisure Park2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Jones Boatyard9 miles, 2¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Jones Boatyard
Hartford Marina13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford Marina

Nearest place to turn

In the direction of Pope's Corner

Pope's Corner9 miles, 5 furlongs away
On this waterway in the direction of Pope's Corner
Fish and Duck Marina9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina
Great Ouse - Braham Dock Junction11 miles, 4½ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Great Ouse - Braham Dock Junction
Willow Walk Winding Hole13 miles, 3½ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Winding Hole
Wicken Lode Junction13 miles, 1 furlong and 1 lock away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Cam - Reach Lode Junction, then on the River Cam (Burwell Lode) to Wicken Lode Junction
Bottisham Lock Weir Exit16 miles, 3 furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Bottisham Lock Weir Exit
Old West River - River Lark Junction17 miles, ¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Old West River - River Lark Junction
Holmes River Junction18 miles, 7½ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Holmes River Junction
Prickwillow Winding Hole19 miles, 1 furlong away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Old West River - River Lark Junction, then on the River Great Ouse (River Lark) to Prickwillow Winding Hole
Baits Bite Lock Weir Exit19 miles, 2¾ furlongs and 1 lock away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Baits Bite Lock Weir Exit

In the direction of Earith Junction

Westview Marina & Leisure Park2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Pike and Eel Marina5 miles, 2¼ furlongs and 2 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Pike and Eel Marina
Jones Boatyard9 miles, 2¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Jones Boatyard
The Waits Moorings Junction9 miles, 6½ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to The Waits Moorings Junction
The Waits Moorings Winding Hole10 miles, ¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to The Waits Moorings Junction, then on the River Great Ouse (Waits Mooring Arm) to The Waits Moorings Winding Hole
Hemingford Lock Weir Exit No 110 miles, 7¾ furlongs and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hemingford Lock Weir Exit No 1
Hemingford Lock Weir Exit No 211 miles and 3 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hemingford Lock Weir Exit No 2
Houghton Lock Weir Exit No 111 miles, 6¼ furlongs and 4 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Houghton Lock Weir Exit No 1
Houghton Lock Weir Entrance No 212 miles, 4½ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Houghton Lock Weir Entrance No 2
Hartford Marina13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford Marina

Nearest self-operated pump-out

In the direction of Pope's Corner

Willow Walk Visitor Moorings13 miles, 3¼ furlongs away
Travel to Pope's Corner, then on the River Great Ouse (Old West River - Large River) to Willow Walk Visitor Moorings

In the direction of Earith Junction

Westview Marina & Leisure Park2 miles, 4¾ furlongs and 1 lock away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Westview Marina & Leisure Park
Hartford Marina13 miles, 4¼ furlongs and 5 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Hartford Marina

Nearest boatyard pump-out

In the direction of Pope's Corner

Fish and Duck Marina9 miles, 5¾ furlongs away
Travel to Pope's Corner, then on the River Cam (Main river - Large River) to Fish and Duck Marina

In the direction of Earith Junction

Buckden Marina Fuel & Pump Out19 miles, 4¾ furlongs and 7 locks away
Travel to Earith Junction, then on the River Great Ouse (Tidal Section) to Brownshill Staunch (Lock), then on the River Great Ouse (Canalized Section) to Buckden Marina Fuel & Pump Out
Direction of TV transmitter (From Wolfbane Cybernetic)
 
 
Geograph
 
Wikipedia

There is no page on Wikipedia called “Site of Flat Bridge”

Wikipedia pages that might relate to Site of Flat Bridge
[Flat Bridge] Flat Bridge The Flat Bridge is a beam bridge across the Rio Cobre on the A1 road connecting the Jamaican capital Kingston, with the north coast tourist [Red Road Flats] The Red Road Flats were a mid-twentieth-century high-rise housing complex located between the districts of Balornock and Barmulloch in the northeast of [Tortilla Flat, Arizona] whenever it came due. Historic Mormon Flat and Boulder Creek Bridges in Tortilla Flat, Arizona Historic Mormon Flat Bridge built in 1924 and located on Highway [Bridge to Nowhere (San Gabriel Mountains)] flood of March 1–2, 1938. The East Fork Road project was abandoned as a result of the floods, leaving the bridge forever stranded in the middle of what [Gordon, Victoria] listed sites, including: Gordon-Egerton Road, Gordon railway station Portland Flat Road, Portland Flat Road Bridge Gordon is situated on the undulating foothills [Crimean Bridge] for both road and rail traffic, and has a length of 19 km (11.8 mi), making it the longest bridge Russia has ever built, and the longest bridge in Europe [Whites Bridge] Flat River. Carrying Whites Bridge Road across the Flat River, it is located north of the Fallasburg Bridge and south of Smyrna. The original bridge was [Dunedin-Waitati Highway] summit of Mount Cargill), Leith Valley Road, Dryden Road, and Pigeon Flat Road; the last of these is the only bridge north of the saddle. Several parts of [Martin Bridge] The Martin Bridge is a road bridge that carries the Manning River Drive across the Manning River in Taree, in the Mid North Coast region of New South [Flat Bush] approved for Flat Bush infrastructure" (PDF). Land Transport News (17): 1–2. June 2006. ISSN 1176-841X. Retrieved 8 December 2009. Ormiston Road Bridge opening
 
Google

Results of Google Search

Freestone Flat Road Bridge (Sonoma County, 1955) | Structurae
Sep 13, 2007 ... Freestone Flat Road Bridge is a truss bridge that was completed in 1955. The project is located in Sonoma County, California, USA, North ...
Freestone Flat Road Bridge - Bridgehunter.com
Deck truss bridge over Salmon Creek on Freestone Flat Road in Occidental.
Flat Bridge - Wikipedia
The Flat Bridge is a beam bridge across the Rio Cobre on the A1 road connecting the Jamaican capital Kingston, with the north coast tourist areas of Dunn's ...
Jack Rabbit Flat Road Bridge - Bridgehunter.com
Bailey pony truss bridge over Burney Creek on Jack Rabbit Flat Road in Burney.
Capital Improvement Projects | Tuolumne County, CA - Official Website
Capital Improvement Projects bridges roads. ... Project · Guardrail Replacement Project · Hardin Flat Road crossing South Fork of Tuolumne River, Bridge No.
Big Oak Flat Road (HAER No. CA-147) written historical and ...
Apr 17, 2012 ... BIG OAK FLAT ROAD HAER NO. CA-147: Yosemite National Park Roads and Bridges: Between Big Oak Flat Entrance and Merced River ...
Tamarack Creek Bridge, Spanning Tamarack Creek on New Big Oak...
Title: Tamarack Creek Bridge, Spanning Tamarack Creek on New Big Oak Flat Road, Yosemite Village, Mariposa County, CA; Contributor Names: Historic ...
Construction Management | Quincy Engineering
Alhambra Valley Road Washout Repair (winner of 2018 APWA Northern California Chapter Disaster or ... RAIL ROAD FLAT ROAD BRIDGE REPLACEMENT.
Road & Bridge | Midland County, TX
Jones Bros. will begin construction on the south end of Cotton Flat Rd and work ... and want to build a driveway, you need to come by the Road & Bridge office to  ...
Rehabilitation of Flat Rock Hill Road Bridge over I-95 in Old Lyme
The Connecticut Department of Transportation is announcing that a bridge rehabilitation project will begin February 1, 2013 on Flat Rock Hill Road in the town of ...