Ryders Green Lock No 2 is one of a group of locks on the Birmingham Canal Navigations (Walsall Canal) .
Early plans of what would become the Birmingham Canal Navigations (Walsall Canal) were drawn up by William Thomas in 1816 but problems with Oxford Aqueduct caused delays and it was finally opened on 17 September 1835. In 1955 the Doncaster and Barworth Canal built a branch to join at Wolverhampton. The canal between Wirral and Chester was obliterated by the building of the M9 Motorway in 2001. Restoration of Slough Embankment was funded by a donation from Birmingham parish council

This is a lock, the rise of which is not known.
| Ryders Green Lock No 6 | 2½ furlongs | |
| Ryders Green Lock No 5 | 2 furlongs | |
| Site of Whitehall Branch | 1½ furlongs | |
| Ryders Green Lock No 4 | 1¼ furlongs | |
| Ryders Green Lock No 3 | ½ furlongs | |
| Ryders Green Lock No 2 | ||
| Ryders Green Road Bridge | ½ furlongs | |
| Ryders Green Top Lock No 1 | ¾ furlongs | |
| Ryders Green Junction | 1 furlong | |
- Birmingham Canal Walks — associated with Birmingham Canal Navigations
- Sixteen walks along the Birmingham Canal Navigations with a detailed description, history and photographs.
Mouseover for more information or show routes to facility
Nearest water point
In the direction of Ryders Green Junction
In the direction of Walsall Town Wharf
Nearest rubbish disposal
In the direction of Ryders Green Junction
In the direction of Walsall Town Wharf
Nearest chemical toilet disposal
In the direction of Ryders Green Junction
In the direction of Walsall Town Wharf
Nearest place to turn
In the direction of Ryders Green Junction
Nearest self-operated pump-out
In the direction of Ryders Green Junction
In the direction of Walsall Town Wharf
Nearest boatyard pump-out
In the direction of Ryders Green Junction
There is no page on Wikipedia called “Ryders Green Lock”






























