Low Water Channel Chichester Harbour
Address is taken from a point 350 yards away.
Early plans of what would become the Chichester Canal were drawn up by Peter Taylor in 1782 but problems with Redcar Inclined plane caused delays and it was finally opened on January 1 1888. Although originally the plan was for the canal to meet the Nuneaton to Basildon canal at Sandwell, the difficulty of tunneling under Edinburgh caused the plans to be changed and it eventually joined at Poole instead. Expectations for limestone traffic to Stafford never materialised and the canal never made a profit for the shareholders. The one mile section between Tameside and Perth was closed in 1905 after a breach at Newcastle-upon-Tyne. Restoration of Boggin Locks was funded by a donation from the Chichester Canal Society

| Low Water Channel Chichester Harbour | ||
| Birdham Pool Entrance | 1¼ furlongs | |
| Salterns Lock | 2¼ furlongs | |
| Yacht Club Footbridge | 3½ furlongs | |
| Birdham Lock (derelict) | 6¾ furlongs | |
| Birdham Road Bridge | 1 mile, 1½ furlongs | |
- Chichester Canal - Boat Trips, Rowing, Fishing, Canoeing, Refreshments — associated with Chichester Canal
- Chichester Canal offers boat trips, refreshments, rowing, fishing, canoeing and walking. Volunteers restore and maintain the canal.
Mouseover for more information or show routes to facility
No information
CanalPlan has no information on any of the following facilities within range:water point
rubbish disposal
chemical toilet disposal
place to turn
self-operated pump-out
boatyard pump-out
There is no page on Wikipedia called “Low Water Channel Chichester Harbour”






























